Thermal Inspection
120 MW solar plant thermal inspection
Thermal scan of 248,000 modules at a 120 MW plant in Karapınar completed in three days.
View DetailsBolu

Eleven bridge piers and two viaducts on the Bolu crossing inspected without rope access.
Setting up a rope crew for piers up to 60 metres tall would have taken months. With KR-6 Gözcü the surface was scanned in four days and crack and corrosion findings were mapped on the 3D model.
Thermal scan of 248,000 modules at a 120 MW plant in Karapınar completed in three days.
View DetailsOrthophoto, DTM and building vectors for an industrial-zone expansion; 2.4 cm horizontal RMSE.
View DetailsVariable-rate application across 62 cooperative parcels in 14 days with 28% water saving.
View DetailsShare the area, objective and timeline and an engineer will return within 24 hours with scope and pricing.